If documents have been issued, the link will be underlined and in blue.)
12-001 RFQ - Design Criteria Package - Hedrick Recreational Complex - AWARDED
12-002 ITB - Cured In-Place Pipe (CIPP) - AWARDED
12-003 ITB - Full Eject Front Loader Refuse Truck - AWARDED
12-004 ITB - Side Loader Refuse Truck - AWARDED
12-005 RFP - Wright Parkway Sidewalks Project - Design/Engineering Svcs - AWARDED
12-006 ITB - Asphalt Paving Annual Bid - AWARDED
12-007 ITB - Precast Concrete Pipe & Structures Annual Bid - NO BIDS RECEIVED
12-008 ITB - Commercial Steel Rolling Fire Doors - AWARDED
12-009 ITB - Demolition Services for Germany Terrace Subdivision AWARDED
12-010 ITB - Precast Concrete Pipe & Structures Annual Bid - AWARDED
12-011 RFP - Project Management Services - Brownfields - AWARDED
12-012 ITB - Herbicides & Pesticides - Golf Course - Annual Bid - AWARDED
12-013 ITB - FWB Water Reuse Project - Phase II - AWARDED
12-014 ITB - Brooks Street Parking Lot Improvements - AWARDED
12-015 ITB - Sidewalk Construction Annual Bid - AWARDED
12-016 RFP - Water Storage Tank Asset Management Program - Posted 03-06-2012; CANCELLED 04-13-2012
12-017 ITB - Utility Infrastructure Installation/Construction - Annual Bid - NO BIDS RECEIVED
12-018 ITB - 50 HP Diesel Tractor with Hydraulic Front Loader - AWARDED
12-019 ITB - Construction of Brooks Landing Waterfront Park - AWARDED
12-020 ITB - FWB Golf Club Reclaimed Water Pumping System - Posted 04-19-2012
12-021 RFP - Downtown Fort Walton Beach Security Camera System - Posted on 04/24/2012
12-022 ITB - Utility Infrastructure Installation/Construction - Annual Bid - Posted on 5-17-2012
| Tue May 22 @ 6:00PM Council Meeting |
| Wed May 23 @ 1:00PM Tourist Development Council (TDC) |
| Wed May 23 @ 4:00PM Library Cooperative |
| Wed May 23 @ 5:30PM Okaloosa Gas Board |
| Thu May 24 @ 8:00AM Board of Adjustment (No Meeting) |
| Thu May 24 @11:00AM Chamber of Commerce Board |

